• Dongguan Intermational Wharf
    ADD: International Container Terminal, Xiexi Management Zone, Shatian
    TEL:+86-769-88868398     88868399
    FAX:+86-769-88864622
Warehousing
Your current position: Home> Facilties> Warehousing
src=/UpFile/Image/f2.jpg
No
/
Items
/
Description
 
Remarks
1
Name 
Dongguan (International) Container Terminal Co., Ltd.
2
Date of starting production
1999-7-1
3
Business Scope
Hong Kong and Macao water transport, loading and unloading, warehousing and transportation at Shidong Port
Business Licence
4
Address 
Xiexi Management Zone, Shatian Town, Dongguan City, Guangdong Province 
5
Length/m
1000
Coastal line: 236 meters
6
L and coverage/m2
180,000 m2 (60,000 m2 of vehicle yard; 60,000 m2 of container yard; 15,000 m2 of warehouse; 30,000 m2 of building; 15,000 m2 of others)
7
Depth alongside/m 
The designed depth is -14 m\the actual depth is -10 to -15 m
35,000 tonnage ships can sail freely
8
Number of berths
4
No.1-4 
9
Berth structure 
Protruded reinfornced concrete structure 
10
Berth name
No.1 container berth\No. 2 bulk berth\No. 3 vehicle berth\No. 4 multi-purpose berth 
11
Berthing capacity
8000 tonnage (designed)
Actually: 20,000 tonnage 
12
Annual handling capacity
containers: 150,000 TEUs\bulk: 1.8 million tons\vehicles: 180,000 
1 TEU is about 20 tons
13
Dock equipment
Refer to the List of Equipment
14
Cargo source \varieties
building material\chemical \electronic\plastic\consumables\vehicles, etc.
15
Ship route
Hong Kong & Macao/Domestic Trade Route before opening of Class-A Port;international route after opening of Class-A Port.
16
Type of ship arriving at the port
Before opening of Class-A Port, various barges with net tonnage below 1000 tons and vehicle roll-on/roll-off ships; after opening of Class-A Port, direct route with 10,000 tonnage 
17
Charge of harbor loading, unloading and stacking
in compliance with the harbor charging criteria of the State Ministry of Communications or below the harbor charging criteria
18
Harbor information system 
A. Fully closed monitoring system; B. Wangyuan Port Management System; C. Financial management system
19
Joint inspection system
A. Customs EDI system; B. National commodity inspection declaration system;C. Frontier pre-report system; D. Maritime and port networking system.
20
Compositino of dock personnel 
There are more than 130 staff members including 20 managerial staff 
including 12 holding college or higher degree
21
Future program of the terminal
Create a top brand in the Delta River Region by using the opportunity of opening of the port
With addition of bonded warehouse, become a leading terminal in Humen Port Development Zone
22
Other advice
A. Speed up the information based report system; B. Lower port inspection frequencies; C. the Termina is going to introduce bridge crane.
 
src=/UpFile/Image/concert_merit_img_p02.jpg
src=/UpFile/Image/concert_merit_img_p03.jpg
正在申请中的保税仓库
普通监管仓库

CopyRight © 2011 Baineng All Rights Reserved. Dongguan Intermational Container Teminal
ADD: International Container Terminal, Xiexi Management Zone, Shatian   Tel:0769-88868398  88868399  Fax:0769-88864622
 mail:218@dgicw.com Web ICP:粤ICP备09055483号